Planning Documents
DETAILED IMPLEMENTATION PLAN
Updated Detailed Implemenation Plan-
posted June 30, 2011
Draft
DIP with edits accepted - posted September 12, 2008
Draft
DIP with meeting edits - posted September 12, 2008
Draft Detailed Implementation Plan - posted August 25, 2008
HYDROGEOLOGY
Final
WRIA 35 Hydrogeology Report (22.3 MB)- posted Jul 8, 2009
(Large file, for a copy on CD, contact Brad Johnson)
HDR_Memo with Response to State Comments - posted Jul 8, 2009
Response to Ecology Comments on Phase I Report - posted Jul 8, 2009
Response to Ecology Comments on Phase II Report - posted Jul 8, 2009
Alpowa Draft Hydrogeology Report (12.5 MB) - posted May 8, 2009
(Large file, for a copy on CD, contact Brad Johnson)
Instream Flow Rule Making Process - posted Dec. 17, 2008
Phase 2
Ground Water Assessment Trip Report - posted Dec. 17, 2008
Seepage Run Assessment Trip Report - posted Dec. 17, 2008
Ground Water Monitoring Protocol - posted Dec. 17, 2008
Phase 1
FINAL Phase I Hydrogeology Report (12.3 MB) -
posted
August 29, 2008
(Large file, for a copy on CD, contact Brad Johnson)
HDR Response to Ecology Comments -
posted
August 29, 2008
DRAFT Phase I Hydrogeology Report (12.6 MB) -
posted
July 2008
(Large file, for a copy on CD, contact Brad Johnson)
INSTREAM HABITAT ASSESSMENT
Instream Habitat Assessment - Final Report (9MB)
- posted posted January 7, 2010
DRAFT Instream Habitat Assessment with Planning Unit Revisions
-posted December 10, 2009
Habitat Asessment Draft Rep. - Alpowa/George Creek - posted May 27, 2009
Habitat Asessment Draft Rep. - Middle Snake - posted May 27, 2009
FINAL Quality Assurance Project Plan - posted February 2009
DRAFT Quality Assurance Project Plan - posted
Sept. 30, 2008
TUCANNON AND PATAHA TMDL STUDY
Tucannon River and Pataha Creek TMDL
Study Presentation
- posted April 9, 2010
DRAFT Tucannon River and Pataha Creek TMDL Study
- posted April 9, 2010
Adopted Watershed Plan- posted
August 31, 2007
SECTIONS
APPENDICE
Appendix A - SEPA Review
Appendix B - Strategies and Tools
Appendix C - Instream Flow
Recommendations
Appendix D - Groundwater Management
Appendix E - Responsible Agencies
Appendix F - Funding Sources
OTHER PLANNING
DOCUMENTS
WRIA 35 Phase 2 Assessment Overview
Project Plan for Enhanced Streamflow
Monitoring
WRIA 35 Public Workshops Summary
WDFW Asotin Creek Salmonid
Production & Evaluation Presentation (PowerPoint)
Revised Streamflow Monitoring Gauge Locations
Minimum Instream Flow Study of Tucannon
River at
Marengo
Surface
Water Source Limitations Map and
Summary Table
Streamflow Management
Minimum Instream Flow
Tucannon River Temperature
Tucannon River Temperature Vs. Elevation
Hydrogeologic Assessment
Snake River Salmon Recovery Plan
Asotin Creek Model Watershed Plan
Asotin Subbasin Plan
Lower Snake Subbasin Plan
Tucannon Subbasin Plan
Snake River Limiting Factors Report
HABITAT PROJECT REPORTS
Tucannon BPA Project Reports
Asotin BPA Project Reports
Pataha BPA Project Reports
Tenmile/Couse BPA Project Reports
FINAL LEVEL 1 ASSESSMENT DOCUMENTS
Executive summary (Posted on 02-11-05)
Table of Contents (Posted on 02-11-05)
Section 1 Intro and Purpose (Posted on 02-11-05)
Section 2 Watershed
Characteristics (Posted on 02-11-05)
Section 2 Exhibits (Posted on 02-11-05)
Section 3 Text (Posted on 02-11-05)
Section 3 Exhibits (Posted on 02-11-05)
Section 4 Text (Posted on 02-11-05)
Section 4 Exhibits (Posted on 02-11-05)
Section 5 Text (Posted on 02-11-05)
Section 5 Exhibits (Posted on 02-11-05)
Section 6 Text (Posted on 02-11-05)
Section 6 Exhibits (Posted on 02-11-05)
Section 7 Ground Water (Posted on 02-11-05)
Section 7 Exhibits (Posted on 02-11-05)
Section 8 Water Balance (Posted on 02-11-05)
Section 9 Instream Flow (Posted on 02-11-05)
Section 10 Recommendations (Posted on 02-11-05)
References (Posted on 02-11-05)
MULTI-PURPOSE STORAGE ASSESSMENT
Water Storage and Availability Needs Assessment
(Posted on 08-16-05)
Entitled Wetland Storage Sites and Screening Criteria
(Posted on 08-16-05)
Three Recommended Wetland Project Locations Identified for Further Assessment and Evaluation (Posted on 08-16-05)
Hydrogeologic Assessment of the Tucannon River, Pataha Creek and Asotin Creek Drainages (Posted on 08-16-05)
WATER QUALITY ASSESSMENT
Pataha Creek Fecal Coliform - Compliance with Water Quality Standards (Posted on 08-16-05)
Asotin Creek Fecal Coliform - Assessment of Existing Data
(Posted on 08-16-05)
Tucannon Temperature Conditions
(Posted on 08-16-05)
Tucannon Temperature
Assessment, Middle Snake Watershed, and WRIA35 (Posted on 08-16-05)
Tucannon River - Comparison of Water Temperature and Elevation
(Posted on 08-16-05)
Tucannon River Temperature Study Presentation
(Posted on 05-5-06)
Tucannon River Temperature Investigation Model Results
(Posted 06-22-06)
Tucannon River Temperature Study Final Document
(Posted 7-7-06)
INSTREAM FLOW ASSESSMENT
Stream Flow Management Framework Draft
(Posted on 08-16-05)
Minimum Instream Flow Framework
(Posted on 08-16-05)
Proposal for Administrative Closures
(Posted on 08-16-05)
Proposed Flow Enhancement Targets for WRIA35 Streams (Posted on 08-16-05)
Tucannon River Minimum Instream Flow Recommendations (Posted 05-05-06)
Tucannon River Minimum Instream Flow Charts
(Posted 05-05-06)
Table A-2 Stream Closure Analysis
(Posted 05-05-06)
Stream Closure Analysis Presentation
(Posted 05-05-06)
Tucannon and Asotin Instream Flow Summary
(Posted 05-22-06)
Stream Flow Management Final Report
(Posted 7-7-06)
Response to Stream Flow Comments
(Posted 7-7-06)
GRAND RONDE ASSESSMENT
Grande Ronde Level 1 Assessment Addendum
(Posted on 08-16-05)
WATER STORAGE
Conceptual Design Report
(Posted on 03-07-06)
Cover (Posted on 03-07-06)
Tables and Figures
(Posted on 03-07-06)
Conceptual Design Report
(Posted on 04-26-06)
Water Storage Alternatives Technical
Memo
(Posted 05-05-06)
Pataha Creek Aquifer Storage Alternative Memo
(Posted 7-7-06)
WATERSHED PLAN
Draft WRIA 35-Middle Snake Watershed Plan (15.6 MB)
(Posted on 04-25-06)
(Large file, for a copy on CD, contact Brad Johnson)
|