DETAILED IMPLEMENTATION PLAN
DETAILED IMPLEMENTATION PLAN -
posted September 29, 2008
Draft
DIP with edits accepted
- posted September 12, 2008
Draft
DIP with meeting edits
- posted September 12, 2008
DRAFT Detailed Implementation Plan
- posted August 25, 2008
_______________________________________________________
|
|
HYDROGEOLOGY
STUDY
FINAL Phase I Hydrogeology Report -
posted
August 29, 2008
HDR Response to Ecology Comments -
posted
August 29, 2008
DRAFT Phase I Hydrogeology Report -
posted
July 2008
_______________________________________________________ |
|
INSTREAM
HABITAT ASSESSMENT
DRAFT Quality Assurance Project Plan
- posted
Sept. 30, 2008
_______________________________________________________ |
|
Tucannon River and Pataha Creek TMDL
Study Presentation
_______________________________________________________ |
|
ADOPTED WATERSHED PLAN - posted
August 31, 2007
SECTIONS
Participants List
Table of Contents
Abbreviations and Acronyms
Executive Summary
Section 1 - Introduction and Background
Section 2 - Planning Process
Section 3 - Key Planning Elements by
Implementation Area
Exhibit 3-2
Exhibit 3-6
Exhibit 3-10
Exhibit 3-14
Exhibit 3-18
Section 4 - General Strategies and Tools
Section 5 - Basin Wide Management
Objectives
Section 6 - Implementation Area
Strategies
Section 7 - Plan Implementation
Considerations
References
APPENDICES
Appendix A - SEPA Review
Appendix B - Strategies and Tools
Appendix C - Instream Flow
Recommendations
Appendix D - Groundwater Management
Appendix E - Responsible Agencies
Appendix F - Funding Sources
|
|
OTHER PLANNING
DOCUMENTS
|
| WRIA 35 Phase 2 Assessment Overview |
| Project Plan for Enhanced Streamflow Monitoring |
| WRIA 35 Public Workshops Summary |
| WDFW Asotin Creek Salmonid Production & Evaluation Presentation |
| Revised Streamflow Monitoring Gauge Locations |
|
Minimum Instream Flow Study of Tucannon
River at Marengo |
|
Surface Water Source Limitations Map and
Summary Table |
| Streamflow Management |
| Minimum Instream Flow |
| Tucannon River Temperature |
|
Tucannon River Temperature Vs Elevation |
|
Hydrogeologic Assessment |
| |
FINAL LEVEL 1 ASSESSMENT DOCUMENTS
|
| Executive summary (Posted on 02-11-05) |
Table of Contents (Posted on 02-11-05) |
Section 1 Intro and Purpose (Posted on 02-11-05) |
Section 2 Watershed Characteristics (Posted on 02-11-05) |
Section 2 Exhibits (Posted on 02-11-05) |
Section 3 Text (Posted on 02-11-05) |
Section 3 Exhibits (Posted on 02-11-05) |
Section 4 Text (Posted on 02-11-05) |
Section 4 Exhibits (Posted on 02-11-05) |
Section 5 Text (Posted on 02-11-05) |
Section 5 Exhibits (Posted on 02-11-05) |
Section 6 Text (Posted on 02-11-05) |
Section 6 Exhibits (Posted on 02-11-05) |
Section 7 Ground Water (Posted on 02-11-05) |
Section 7 Exhibits (Posted on 02-11-05) |
Section 8 Water Balance (Posted on 02-11-05) |
Section 8 Exhibits (Posted on 02-11-05) |
Section 9 Instream Flow (Posted on 02-11-05) |
Section 10 Recommendations (Posted on 02-11-05) |
References (Posted on 02-11-05) |
| |
MULTI-PURPOSE STORAGE ASSESSMENT
|
|
Water Storage and Availability Needs Assessment (Posted on 08-16-05) |
Entitled Wetland Storage Sites and Screening Criteria (Posted on 08-16-05) |
Three Recommended Wetland Project Locations Identified for Further Assessment and Evaluation (Posted on 08-16-05) |
Hydrogeologic Assessment of the Tucannon River, Pataha Creek and Asotin Creek Drainages (Posted on 08-16-05) |
| |
WATER QUALITY ASSESSMENT
|
|
Pataha Creek Fecal Coliform - Compliance with Water Quality Standards (Posted on 08-16-05) |
Asotin Creek Fecal Coliform - Assessment of Existing Data (Posted on 08-16-05) |
Tucannon Temperature Conditions (Posted on 08-16-05) |
Tucannon Temperature Assessment, Middle Snake Watershed, and WRIA35 (Posted on 08-16-05) |
Tucannon River - Comparison of Water Temperature and Elevation (Posted on 08-16-05) |
|
Tucannon River Temperature Study Presentation (Posted on 05-5-06) |
|
Tucannon River Temperature Investigation Model Results (Posted 06-22-06) |
|
Tucannon River Temperature Study Final Document (Posted 7-7-06) |
| |
INSTREAM FLOW ASSESSMENT
|
| Stream Flow Management Framework Draft (Posted on 08-16-05) |
Minimum Instream Flow Framework (Posted on 08-16-05) |
Proposal for Administrative Closures (Posted on 08-16-05) |
Proposed Flow Enhancement Targets for WRIA35 Streams (Posted on 08-16-05) |
|
Tucannon River Minimum Instream Flow Recommendations (Posted 05-05-06) |
|
Tucannon River Minimum Instream Flow Charts (Posted 05-05-06) |
|
Table A-2 Stream Closure Analysis (Posted 05-05-06) |
|
Stream Closure Analysis Presentation (Posted 05-05-06) |
|
Tucannon and Asotin Instream Flow Summary (Posted 05-22-06) |
|
Stream Flow Management Final Report (Posted 7-7-06) |
|
Response to Stream Flow Comments Posted (7-7-06) |
| |
GRANDE RONDE ASSESSMENT
|
|
Grande Ronde Level 1 Assessment Addendum (Posted on 08-16-05) |
| |
WATER STORAGE
|
| Conceptual Design Report (Posted on 03-07-06) |
Cover (Posted on 03-07-06) |
|
Tables and Figures (Posted on 03-07-06) |
|
Conceptual Design Report (Posted on 04-26-06) |
|
Water Storage Alternatives Technical
Memo (Posted 05-05-06) |
|
Pataha Creek Aquifer Storage Alternative
Memo (Posted 7-7-06) |
| |
WATERSHED PLAN
Draft WRIA 35-Middle Snake Watershed
Plan (Posted on 04-25-06) |