PLANNING DOCUMENTS

 

_______________________________________________________

 

DETAILED IMPLEMENTATION PLAN

DETAILED IMPLEMENTATION PLAN - posted September 29, 2008

Draft DIP with edits accepted - posted September 12, 2008

Draft DIP with meeting edits - posted September 12, 2008

DRAFT Detailed Implementation Plan - posted August 25, 2008

_______________________________________________________

HYDROGEOLOGY STUDY

 

FINAL Phase I Hydrogeology Report - posted August 29, 2008

HDR Response to Ecology Comments - posted August 29, 2008

DRAFT Phase I Hydrogeology Report - posted July 2008

_______________________________________________________

INSTREAM HABITAT ASSESSMENT

 

DRAFT Quality Assurance Project Plan - posted Sept. 30, 2008

_______________________________________________________

 

Tucannon River and Pataha Creek TMDL Study Presentation

_______________________________________________________

 

ADOPTED WATERSHED PLAN - posted August 31, 2007

 

SECTIONS

     Participants List

     Table of Contents

     Abbreviations and Acronyms

     Executive Summary

     Section 1 - Introduction and Background

     Section 2 - Planning Process

     Section 3 - Key Planning Elements by Implementation Area

          Exhibit 3-2

          Exhibit 3-6

          Exhibit 3-10

          Exhibit 3-14

          Exhibit 3-18

     Section 4 - General Strategies and Tools

     Section 5 - Basin Wide Management Objectives

     Section 6 - Implementation Area Strategies

     Section 7 - Plan Implementation Considerations

     References

 

APPENDICES

     Appendix A - SEPA Review

     Appendix B - Strategies and Tools

     Appendix C - Instream Flow Recommendations

     Appendix D - Groundwater Management

     Appendix E - Responsible Agencies

     Appendix F - Funding Sources

 

 

OTHER PLANNING DOCUMENTS

 

WRIA 35 Phase 2 Assessment Overview
Project Plan for Enhanced Streamflow Monitoring
WRIA 35 Public Workshops Summary
WDFW Asotin Creek Salmonid Production & Evaluation Presentation
Revised Streamflow Monitoring Gauge Locations
Minimum Instream Flow Study of Tucannon River at Marengo
Surface Water Source Limitations Map and Summary Table
Streamflow Management
Minimum Instream Flow
Tucannon River Temperature
Tucannon River Temperature Vs Elevation
Hydrogeologic Assessment
 
FINAL LEVEL 1 ASSESSMENT DOCUMENTS
Executive summary (Posted on 02-11-05)
Table of Contents (Posted on 02-11-05)
Section 1 Intro and Purpose (Posted on 02-11-05)
Section 2 Watershed Characteristics (Posted on 02-11-05)
Section 2 Exhibits (Posted on 02-11-05)
Section 3 Text (Posted on 02-11-05)
Section 3 Exhibits (Posted on 02-11-05)
Section 4 Text (Posted on 02-11-05)
Section 4 Exhibits (Posted on 02-11-05)
Section 5 Text (Posted on 02-11-05)
Section 5 Exhibits (Posted on 02-11-05)
Section 6 Text (Posted on 02-11-05)
Section 6 Exhibits (Posted on 02-11-05)
Section 7 Ground Water (Posted on 02-11-05)
Section 7 Exhibits (Posted on 02-11-05)
Section 8 Water Balance (Posted on 02-11-05)
Section 8 Exhibits (Posted on 02-11-05)
Section 9 Instream Flow (Posted on 02-11-05)
Section 10 Recommendations (Posted on 02-11-05)
References (Posted on 02-11-05)
 
MULTI-PURPOSE STORAGE ASSESSMENT
Water Storage and Availability Needs Assessment (Posted on 08-16-05)
Entitled Wetland Storage Sites and Screening Criteria (Posted on 08-16-05)
Three Recommended Wetland Project Locations Identified for Further Assessment and Evaluation (Posted on 08-16-05)
Hydrogeologic Assessment of the Tucannon River, Pataha Creek and Asotin Creek Drainages (Posted on 08-16-05)
 
WATER QUALITY ASSESSMENT
Pataha Creek Fecal Coliform - Compliance with Water Quality Standards (Posted on 08-16-05)
Asotin Creek Fecal Coliform - Assessment of Existing Data (Posted on 08-16-05)
Tucannon Temperature Conditions (Posted on 08-16-05)
Tucannon Temperature Assessment, Middle Snake Watershed, and WRIA35 (Posted on 08-16-05)
Tucannon River - Comparison of Water Temperature and Elevation (Posted on 08-16-05)
Tucannon River Temperature Study Presentation (Posted on 05-5-06)
Tucannon River Temperature Investigation Model Results (Posted 06-22-06)
Tucannon River Temperature Study Final Document (Posted 7-7-06)
 
INSTREAM FLOW ASSESSMENT
Stream Flow Management Framework Draft (Posted on 08-16-05)
Minimum Instream Flow Framework (Posted on 08-16-05)
Proposal for Administrative Closures (Posted on 08-16-05)
Proposed Flow Enhancement Targets for WRIA35 Streams (Posted on 08-16-05)
Tucannon River Minimum Instream Flow Recommendations (Posted 05-05-06)
Tucannon River Minimum Instream Flow Charts (Posted 05-05-06)
Table A-2 Stream Closure Analysis (Posted 05-05-06)
Stream Closure Analysis Presentation (Posted 05-05-06)
Tucannon and Asotin Instream Flow Summary (Posted 05-22-06)
Stream Flow Management Final Report (Posted 7-7-06)
Response to Stream Flow Comments Posted (7-7-06)
 
GRANDE RONDE ASSESSMENT
Grande Ronde Level 1 Assessment Addendum (Posted on 08-16-05)
 
WATER STORAGE
Conceptual Design Report (Posted on 03-07-06)
Cover (Posted on 03-07-06)
Tables and Figures (Posted on 03-07-06)
Conceptual Design Report (Posted on 04-26-06)
Water Storage Alternatives Technical Memo (Posted 05-05-06)
Pataha Creek Aquifer Storage Alternative Memo (Posted 7-7-06)
 

WATERSHED PLAN

Draft WRIA 35-Middle Snake Watershed Plan (Posted on 04-25-06)